Black and white vintage magazine-style print titled "The Modern Muse" with a bold gothic headline, featuring a glamorous photograph of a woman in a towel turban, cat-eye sunglasses, and drop earrings applying lip gloss beneath the witty headline "Fashionably Behind Schedule."
See it at real size
Every size of this piece at true scale, hung 8 in above an 84 in sofa. Over a sofa, art looks right at about two thirds of the sofa width: 56 to 63 in here.
Every size drawn to scale on a real wall, with the most chosen size shown as a blank framed canvas. Dashed line: the ideal art width over this 84 in sofa (56 in). Too narrow on its own? Hang two side by side.
- Measure the furniture, not the wall. Art over a sofa, bed, or dresser looks best at two thirds to three quarters of its width.
- Hang it at eye level. Center the art 57 to 60 in from the floor. Over furniture, leave 6 to 10 in between the furniture and the bottom of the art.
- Pairs and sets: leave 2 to 3 in between pieces and measure the pair as one width.
- Still unsure? Outline the size on your wall with painter's tape and live with it for a day.
Sizes listed are the artwork.
From Our Community
What arrives at your door
Pinewood frame, built from FSC certified wood
Canvas floated in a 1.25 inch deep frame
Hanger installed. Out of the box and on the wall in minutes
Gallery wraps arrive stretched, stapled, and ready to hang
Curated in Wisconsin. Every purchase gives back to Milwaukee’s homeless veterans.











